Armstrong Integrated Systems Ltd - Off-Site manufacture speeds the way for HBOS

Off-site manufactured plant rooms from Armstrong Integrated Systems cut programme timescales to a minimum for the expansion of two HBOS data centres. The company’s sites in Copley and Pudsey, Yorkshire, were scheduled for expansion with the construction of additional buildings to house employees and equipment. Chilled water pumping plant rooms were needed to manage the building services requirements of each site. The decision to have these manufactured off-site brought numerous benefits including shorter project timescales, reduced health and safety risk, and greater efficiency of installation on the roof of each newly-erected building.
Four plant rooms were manufactured in total by Armstrong Integrated Systems for HBOS. The designs included 3600kW plate heat exchangers, pumps, de-aerators, side-stream filters and control equipment. Armstrong constructed the plant rooms in their purpose-designed manufacturing facility in Halesowen. Each plant room was supplied fully-assembled to site, housed in an enclosure, and requiring only final connections.
The two plant rooms for the Copley site were combined within a single enclosure with a dividing wall. Measuring 20 metres by 12 metres, the finished plant room had a total weight of 127.5 tonnes. In order to make it easy to transport to site, and to crane onto the roof, it was designed in five modular sections, each weighing up to 24 tonnes.
The two smaller plant rooms for the Pudsey site, each measuring 11 metres by 8 metres were constructed in separate enclosures. The enclosures of all of the plant rooms were produced by Armstrong in a corporate colour scheme to match the existing buildings at the Copley and Pudsey sites.
As each plant room was to be positioned on the roof of a newly-erected building, and work could therefore not commence until the end of the construction phase, the building services element of the project had a significant impact on how quickly the building owners could occupy the data centres. Manufacturing the plant rooms off-site enabled the construction of the plant rooms to take place concurrently with the rest of the construction project, over a sixteen week period, instead of at the end of the building process. This essentially removed the plant room part of the project from the critical path, and final installation was achieved within days, instead of requiring a number of weeks.
As the other buildings on site were occupied throughout the expansion, off-site manufacture assisted greatly in reducing health and safety risk. For HBOS workers, the attendance of contractors on site for the installation was reduced from weeks to just days. In addition, assembly work which would have otherwise been carried out at height and outdoors, was managed in the more easily controlled environment of a factory. Studies have shown that the factory environment also facilitates higher levels of finished quality for plant rooms and leads to shorter timescales as there are not the constrictions of weather, access and bottlenecks relating to other aspects of the build.
Armstrong Integrated Systems utilises the latest 3D computer modelling technology when planning plant rooms, and this was particularly beneficial in the HBOS project. A second expansion phase is planned by the company in the future at the Copley and Pudsey sites, and Armstrong was able to incorporate the requirements of Phase 2 into the designs of Phase 1 in order that the enclosures will be purpose-designed for fitting of the new equipment when the time comes for further expansion.
Steve Cooper, managing director of Armstrong Integrated Systems said, “In projects where occupied sites are being expanded, there really is no better solution than off-site manufacture. In the Copley and Pudsey project for HBOS, the positioning of the plant room on the roof of a new building made off-site construction an even more valuable construction technique.”

Email: Lhousepr@aol.com 
 


Autodesk Building performance analysis software News 260307

DLG Architects Architect mixed use development News 260307

WS Atkins plc Design consultants property development designer News 260307

WS Atkins plc Design consultants property development designer News 260307-2

Bachy Soletanche Geotechnical Specialists Structural Retaining Walls News 260307

Timeless Ltd Stainless steel tube castings News 260307

Carillion plc Civil engineering contractors engineer News 260307

HM Revenue & Customs Construction industry scheme new CIS News 260307

Go-Gum Ltd Remove graffiti stains cleaning solution News 260307

steppDESIGN Town centre regeneration urban design News 270307

Danfoss Randall Ltd Fan coil actuators heating controls News 270307

Wavin Plastics Drainage Underground pipesducting Underfloor Heating News 270307

Integrated Environmental Solutions (IES) Ltd Building performance analysis software tools News 270307

Dimplex Boilers Water Heaters Heat Pumps News 270307

Women in Property Women in property industry award News 280307

British Property Federation Updated code leasing business premises News 280307

ISG InteriorExterior Interior Exterior Renovation Refurbishment News 280307

Bosch Security Systems Video Recording Manager Easy Series News 280307

British Gypsum Plasterboards Plasters Drylining News 280307

S&P Coil Products Ltd Manufacturer heating equipment supplier News 280307

Toshiba Air Conditioning Air Conditioning Systems Chilled Beams News 280307

Carrier Air Conditioning Specialist fan coil test laboratory News 280307

Carrier Air Conditioning Chillers air handling units fan coils News 210208-2

Mailbox Solutions Mailbox distributor mail storage box News 280307

Door & Hardware Federation Conference door shutter hardware industry News 280307

British Harlequin Home dance studio floors News 280307

Colt International Ltd Water refrigerant flow air conditioning News 290307

The American Hardwood Export Council Sustainable timber red oak hardwood News 290307

CMS Acoustics Solutions Acoustic wall covering system News 290307

Slaney Direct Ltd Thermal transmitting device technology News 290307

Polyflor Ltd Sports Surfaces Safety Flooring News 290307

Armstrong Integrated Systems Ltd Manufacturer plant room installation News 290307

Dimplex Boilers Water Heaters Heat Pumps News 270307

Weatherite Building Services Ltd Design kitchen extract systems News 290307

SOE IPlantE Construction design management regulations News 290307

CABE House builders reduce carbon emissions News 290307

Knauf Drywall Plasterboards Plasters Drylining Wall Linings News 290307

CIOB Building Control and Standards News 290307

BASF Insulation foam climate protection News 300307

ISG InteriorExterior Interior Exterior Renovation Refurbishment News 300307

SAS International Ceiling Systems ceiling panels tiles News 300307

Independent Access Lifts Domestic vertical platform lift News 300307

Eaton-Williams Performance Louvres Dehumidification Humidification News 300307

Andrews Heating Company Ltd Sustainable heating water solutions News 300307

BASF Energy saving thermal insulation News 300307-2

Marley Eternit Roofing Clay Tiles Concerete Tiles News 300307

APT Group of Companies Parking vehicle traffic control applications News 300307

Remote Video Response Remote CCTV security cameras News 300307

Unico System International Ltd Central air conditioning heating ventilation News 300307

Abbeyfield UK Elderly care housing development News 300307

Elson Hot Water Hot cold water storage systems News 300307

EAE Busbar Systems Ltd Busbar trunking systems uk distribution News 020407

Magliner Motorised hand delivery truck News 020407

ARDEX UK Ltd Screeds Renders Ceramic Adhesives Grouts News 020407

Gelder Group Construction company award News 020407

Wavin Plastics Rainwater Disposal Roof Floor News 020408

Twyford Bathrooms Washroom Bathrooms Showers Enclosures Urinals News 020407

Jaga Home Heating Radiator heated towel rail designers News 020408

Marmax Products Ltd Recycled plastic outdoor furniture News 020407

Kawneer UK Curtain Wall Systems Door systems News 040207

ADPRO Digital video security systems News 020407

Clarke Instruments Ltd Turnstiles access control barriers News 030407

WS Atkins plc Property development project architect News 030407

Simmtronic Lighting Control Management Systems Dimming News 030407

Saint-Gobain Isover Building materials distribution News 040407

Ceracasa Spanish wall tile floor tile manufacturer News 040407

Symm & Co Ltd Restoration building refurbishment projects News 040407

Chrissie Fairlamb Interior Design Freelance interior designer News 040407

Carillion plc Land stabilisation coast protection scheme News 040407

SureSet Resin bound surfacing system News 040407

Fläkt Woods Air Movement Fans Supply Extract News 050407

PSI Transient voltage surge arrestor News 040407

ARDEX Screeds Renders Ceramic Adhesives Grouts News 050407

Fläkt Woods Air Movement Fans Supply Extract News 050407-2

Carillion Construction civil engineering award News 050407

Weatherite Building Services Ltd Air Handling Units Heat Pumps News 050407

The Edinburgh Fireplace Gallery Hand crafted wooden mantelpiece News 050407

Chartered Institution of Wastes Management Waste recycling resource management News 050407

Kee Klamp Ltd Roof guardrail modules installation News 050407

Socomec UPS Industrial switchgear UPS systems News 050407

The Madano Partnership Urban landscape urban development News 050407

Bacou-Dalloz Ltd Work wear safety equipment News 050407

Arundel Jones Associates LLP Registered in England and Wales No. OC330189
Hill Farm, Linton Hill, Maidstone, Kent ME 17 4AL
Tel : 01622 745333 email
copyright all rights reserved

News Categories : Manufacturer plant room installation