Subscribe to our weekly newsletters
Subscribe to newsletter

 

Editor's Note:  Gypsum Product Development Association provide:-

Gypsum based building materials and systemsGypsum based building materials and systems
 

Request Information

Home
Include Article
Advertise
 

 

 
 

Links
Request Information
Terms of use
Contact

 

Request Facilities / Interiors product information

Request Architectural product information A-J

Request Architectural product information K-Z

Request Mechanical HVAC product information

Request Electrical product information

   
 

Gypsum Products Development - PFI project helps point the way to achieving plasterboard industry's Ashdown Agreement targets

The Ashdown Agreement on plasterboard recycling, signed earlier this year by the Gypsum Product Development Association (GPDA) and DEFRA, sets demanding targets for the recycling levels to be achieved by the industry in the coming years. Although they are tough, they are also achievable – a fact which has been clearly demonstrated at a major PFI project at Ipswich Hospital.

Critical to reducing the amount of construction site waste sent to landfill are careful control of board supply and sizes to minimise waste at the outset and the implementation of efficient site waste collection and recycling procedures. Not only have both steps been central to the approach adopted at Ipswich but they have also been proven to be cost neutral – clearly demonstrating that building in a sustainable way need not impact adversely on the industry’s financial margins.

The Garrett Anderson Centre at Ipswich is a new £26m, four storey, treatment centre, constructed for the Ipswich Hospital NHS Trust by Kier Eastern. Plasterboard systems were supplied by Knauf Drywall, and the plasterboard installation contractor was BR Hodgson. They worked in partnership with waste and environmental management specialist Wastefile to complete the ‘recycling circle’.

Kier used some 22,000m2 (295 tonnes) of plasterboard on the project and was able to recycle some 81 tonnes through the waste management approach adopted.

The waste minimisation strategy for the development began at the design stage, with a system agreed which allowed the number of layers of plasterboard to be reduced and a limit to the number of different board types to just five.

Boards for the project were specially manufactured to match the three metre room height, to substantially eliminate the need for cutting on site. Infill sections at the head of the walls within the profiled decking were manufactured off site to the exact profile of the decking, again both reducing waste and speeding installation.

During the installation phase BR Hodgson took responsibility for segregating plasterboard waste and placing it in designated containers. Kier Eastern arranged for these to be collected on a two-weekly cycle by Wastefile UK so that the waste could be returned to the Knauf manufacturing facility. Here the company’s recycling plant removes the paper facings from the off cuts and produces a recycled gypsum product suitable for re-use in the production process.

Says Steve Wilson recycling manager at Knauf Drywall: “This project is a prime example of the way in which making waste minimisation part of the design process and putting in place practical measures for waste segregation can bring real savings. Co-operation between the parties involved meant it was a simple matter to avoid any significant contamination of the board waste, which is important to ensure it can be readily recycled. Kier Eastern undertook a detailed cost benefit analysis of disposal to landfill compared to a take back/recycling scheme based on 10 per cent plasterboard wastage and this also showed the scheme to be completely cost neutral.”

Crispin Dunn-Meynell of the GPDA adds: “We know that the combination of wasteful design, off cuts, damaged boards and over ordering can account for wastage of up to 25 per cent on site. It is evident that this can be very significantly reduced by adopting the approach taken at the Garrett Anderson Centre. If every major scheme utilising plasterboard takes similar steps then the potential for waste reduction will quickly begin to bring down the current waste figure which is running at about 300,000 tonnes a year. It is easier to implement such measures on large schemes but all plasterboard manufacturers are now also introducing ways to make it simpler to recycle from smaller projects, so every developer can potentially make a contribution.”

Email: mfarrington@golleyslater.co.uk
 


Icopal Roofs Finishes roofing materials membranes News 280807

Vencel Resil Insulation Trace Heating Foundation Solutions News 280807

DECRA Roof tiles and materials News 280807

Edmond Shipway Construction, planning and development News 280807

Tarkett Marley Floors Fully Flexible Sheet and Tiles News 280807

Tarkett Marley Floors Fully Flexible Sheet and Tiles News 280807-2

SCHOTT UK Glass manufacturer News 280807

Icopal Systems Roofing tiles and membrane systems News 280807

Fläkt Woods Air Movement Fans Supply Extract Units News 280807

Fläkt Woods Air Movement Fans Supply Extract Units News 280807-2

Johnson & Starley Independent social housing provider News 280807

Aico Ltd Smoke alarms and fire safety News 280807

Spectrum Industrial British Standard safety signs News 280807

Mouchel Parkman Architecture, quantity surveying News 280807

Robinson Willey Fire surrounds and fire places News 280807

WindowMaster Window Installation News 280807

ISG Totty Construction Services Specialists New Builds News 290807

Salus Heating controls manufacturer News 090807

Marley Eternit Roofing and cladding News 290807

P+HS Architects Architecture, planning and development News 290807

Saniflo Saniplus macerator system News 290807

Saniflo Saniplus small bore macerator News 290807

Laidlaw Solutions Stairs Ramps handrails balustrades News 290807

Xtratherm Cavity resistance products News 290807

Strongwood Log Homes UK Log-home producers News 290807

Ask Life Residential schemes News 300807

PRP Architects Ltd Architecture, planning and development News 300807

Arcelor Construction UK Structural support for lightweight roof systems News 300807

TDSi Limited Access control specialist News 300807

Klober Ltd Roofing Accessories News 300807

Armstrong Integrated Systems Off site construction 300807

ISG Jackson Construction Services Specialists New Builds News 300807

Oventrop UK Ltd Heating and cooling systems News 300807

Unico System International Ltd Heating systems News 300807

Fakro GB Ltd Roof window manufacturer News 310807

ISG Totty Building Services Contractor News 310807

Bachy Soletanche Geotechnical Specialists Structural Retaining Walls News 310807

ISG Jackson Construction Services Specialists New Builds News 310807

Alpha Rail Ltd Railings and gates News 310807

ISG Jackson Construction Services Specialists New Builds News 310807-2

Alpha Rail Ltd Railings and gates News 310807-2

Arcelor Construction UK Steel roofing and cladding supplier News 310807

Gypsum Product Development Association Gypsum based building materials and systems News 310807

Balcony Systems Ltd Balustrading and glazing solutions News 310807

Fläkt Woods Limited Air Movement Fans Supply Extract Units News 310807

S & P Coil Products Ltd Doors Heaters Air Curtains Air Curtains News 310807

SAS Metal Ceilings Metal Ceilings News 030907

Dawn Construction Construction, development and planning News 030907

Dawn Construction Construction, planning and development News 030907-2

Stannah Lifts Ltd Access Lifts range News 030907

APS Masonry of Oxford Stone masonry News 030907

Wavin Plastics Rainwater Disposal Roof Floor Linear Drainage News 030907

Kawneer Curtain Wall Systems Door systems News 030907

Carillion plc Construction, development and planning News 030907

Kalzip Perforated facades News 030907

Dawn Construction Construction, planning and development News 030907

Carrier Air Conditioning Air conditioning systems News 040907

IES Consulting Commercial software provider News 040907

Persimmon Homes Construction, development and planning News 040907

Cembrit Blunn Fibre reinforced cement products News 040907

Axis Communication Security installer News 040907

British Gypsum Plaster, Plasterboard and Drylining Systems News 040907

British Harlequin Dance floor coverings and sprung floor systems News 050907

Faithful+Gould Project management and cost consultants News 050907

Faithful+Gould Project management and cost consultants News 050907-2

Faithful+Gould Project management and cost consultants News 050907-3

Sound Service (Oxford) Ltd Noise Control Insulated Panels News 050907

Armorgard Secure storage News 050907

Alimak Hek Industrial Lift range News 050907

British Gypsum Plaster, Plasterboard and Drylining Systems News 050907

Persimmon Homes Construction, planning and development News 050907

Persimmon Homes Construction, planning and development News 050907-2

LEAF Awards The Public Building Award's In Design News 050907

P+HS Architects Architecture and design News 060907

Ecolec Space saving electrical heating News 060907

Polyflor Ltd Commercial flooring specialist News 060907

Faithful+Gould Project management and cost consultants News 060907

Telling Lime Products Ltd Lime resilience and repair News 060907

Faithful+Gould Project management and cost consultants News 070907

Arcelor Construction UK Structural metal roof lining systems News 070907

Scottish Building Federation Employment in the construction industry News 070907

Optex Europe Detection technology News 070907

ISG Construction Services Specialists New Builds News 070907

Decra UK Lightweight roof systems News 070907

Ward Topdek Pre-engineered composite roof panel News 070907

Wavin Plastics Drainage Underground pipesductingRainwater Disposal News 070907

Arundel Jones Associates LLP Registered in England and Wales No. OC330189
Hill Farm, Linton Hill, Maidstone, Kent ME 17 4AL
Tel : 01622 745333 email
copyright all rights reserved

News Categories : Gypsum based building materials and systems