Subscribe to our weekly newsletters
Subscribe to newsletter

 

Editor's Note:  C & E Scaffolding provide:-

Secure scaffold steel purlinsSecure scaffold steel purlins
 

Request Information

Home
Include Article
Advertise
 

 

 
 

Links
Request Information
Terms of use
Contact

 

home

   
 

C & E Scaffolding - Introducing Jacktie – an advanced tool in securing to cladded steelwork

The need to secure scaffold to steel purlins in places where access is only available from one side and there is not enough room for a buttress to be erected has led to the innovation of the Jacktie.
Ideally suited to the access and scaffolding industry, the 25mm Jacktie provides a method of securing to cladded steelwork, hollow section steel structures or RSJs where access is limited. The tool can easily be used with ring bolts to tie the scaffolding to the building, and must be secured to the steel purlin.
Jacktie offers a number of key benefits, not least of all in safety, as it can only be tightened or removed with the appropriate key. Other benefits include:
The elimination of the need to erect a buttress to stabilise scaffolding, potentially saving pounds on labour and material costs
A neat and clean finish on the cladding as the 25mm hole can be covered with a plug
It is recoverable and so can be used over and over again.
Mike Cheetham, Director of C & E Scaffolding said, “I came up with the idea of the Jacktie initially as a solution to securing scaffold to steel purlins in places where access is only available from one side and there is not enough room for a buttress to be erected, for example buildings close to railway embankments. Currently, most scaffold companies will know that the only way to tie the scaffolding to the building would be to have a sheeting company cut a large enough hole in the cladding to allow the scaffolding to be tied to the steelwork using conventional tube and fittings.
Once the scaffolding is taken down, the building is then left with a large unsightly patch in the cladding which has to be made good by the cladding company. By using the Jacktie, you only need to drill a 25mm hole which can be covered with a translucent or colour coded plug on dismantle of the scaffolding, which is far more pleasing to the eye than a large patch in the cladding.”

The Jacktie is installed in six easy steps, starting with drilling the hole through the cladding to the steel purlin behind. Once in place, a key is used to engage the locking pins of the Jacktie, which is then pulled back, allowing it to lock in place behind the steelwork, then the wheel collar is hand-tightened up to the face of the cladding. A 16mm ring bolt can then be screwed into the front of the Jacktie and scaffold tube can be attached through the ring bolt to tie the scaffolding to the building using the standard procedure for physical ties as detailed in BS5973.
Designed and tested to the standards of BS5973 section 2 paragraph 9.7.1 (e), the Jacktie has a safety factor in excess of 5:1. Measuring 25mm in diameter and 190mm in length, it has an inwards/outwards capacity of 6.25kn.
Other sizes of the Jacktie are currently being researched and developed which will make it suitable for many other trades and uses.

Email: c-escaffolding@btconnect.com
 


AXA UK Age discrimination in the workplace News 290107

ISG Totty Construction Services Specialists New Builds News 290107

Sunderland City Council Swimming pool Sunderland News 290107

MITA UK Ltd Cable Trays Ladders Datatray News 290107

MITA UK Ltd Cable Trays Ladders Datatray News 290107-2

Wetroom Innovations wet room drainage News 290107

Chartered Institute of Building Building Control and Standards News 290107

Honeywell International Valves Pipework Systems Motorised Valves News 290107

Cummins Ltd Construction industry diesel power engines News 300107

Ancon Building Products Masonry Support Systems Wall Ties News 300107

Cummins Ltd Diesel engines industrial diesel power News 300107

Wickens Engineering Industrial Storage News 300107

Fläkt Woods Ltd Air Handling Units Fan Coils News 010207

CODA Architect Construction industry architect News 310107

Urban Engineering Shelter canopy manufacturer News 310107

WS Atkins plc Architecture engineering project management services News 310107

Cummins Tier Industrial engine construction industry News 310107

Cummins Industrial engine construction industry News 310107-2

ISG Totty Construction Services Specialists New Builds News 010207

ISG InteriorExterior Interior exterior refurbishment specialist News 010207

Electro Mechanical Ltd Precision motors linear actuators supplier News 010207

Lafarge Plasterboard Acoustic plasterboard decorative drywall News 010207

Thomas Pink Store refurbishment shop refit News 020207

Colt International Ltd Smoke control climate control systems News 020207

Toshiba Air Conditioning Air conditioning heating systems News 020207

Joint Contracts Tribunal Joint Contracts Tribunal PR News 050207

Honeywell International Valves Pipework Systems Motorised Valves News 050207

Airedale Energy efficient air conditioning chillers News 050207

Klaxon Signals Visual audio fire alarms News 050207

WindowMaster Natural ventilation intelligent automated windows News 050207

ISG Jackson Construction Services Specialists New Builds News 050207

Icopal Systems Roofing fall protection systems News 050207

Treetops Development Company City dwellings property developer News 050207

Marley Eternit Roofing Clay Tiles Concerete Tiles News 050207

Twyford Bathrooms Bathroom sanitaryware specification News 050207

Wernick Buildings Bathroom sanitaryware specification News 050207

Bachy Soletanche Geotechnical Specialists Structural Retaining Walls News 050207

Hawkins Brown Construction Architects and Developers News 050207

Chartered Institute of Building Conservation, Mainenance and Refurbishment News 070207

Johnson & Starley Ltd Mechanical ventilation heat recovery News 070207

The Joint Contracts Tribunal Joint Contracts Tribunal 070207-2

Holyrood Communications housing future conference scotland News 070207

Honeywell International Valves Pipework Systems Motorised Valves News 070207

ISG Totty Building Construction Services Specialists New Builds News 070207

Bosch Security Systems Video Recording Manager Easy Series News 070207

Bosch Security Systems Video Recording Manager Abacus Evolution News 070207-2

CABE Building design review service News 080207

Bachy Soletanche Geotechnical Specialists Structural Retaining Walls News 080207

Oracle Storage Systems Mobile shelving storage systems News 080207

Urban Engineering Design youth shelter installation News 080208

SAS International Ceiling Systems ceiling panels tiles News 080207

British Harlequin Home dance sprung floor News 090207

Schneider Electric Ltd Low Voltage Switchgear News 090207

C & E Scaffolding Secure scaffold steel purlins News 090207

Wavin Plastics Drainage Underground pipesducting Underfloor Heating News 090207

Wavin Plastics Drainage Underground pipesducting Rainwater Disposal News 090207-2

Panasonic UK Laptop notebook construction industry News 090207

Arundel Jones Associates LLP Registered in England and Wales No. OC330189
Hill Farm, Linton Hill, Maidstone, Kent ME 17 4AL
Tel : 01622 745333 email
copyright all rights reserved

News Categories : Secure scaffold steel purlins