Subscribe to our weekly newsletters
Subscribe to newsletter

 

Editor's Note:  Bachy Soletanche provide:-

Geotechnical SpecialistsGeotechnical Specialists
PilingPiling
Structural Retaining WallsStructural Retaining Walls
Ground Anchors Soil NailersGround Anchors Soil Nailers
Jet Groating Injection GroutingJet Groating Injection Grouting
Environmental EngineeringEnvironmental Engineering
Building Design EngineersBuilding Design Engineers
Civil Engineering ProjectsCivil Engineering Projects

Request Information

Home
Include Article
Advertise
 

 

 
 

Links
Request Information
Terms of use
Contact

 

Request Facilities / Interiors product information

Request Architectural product information A-J

Request Architectural product information K-Z

Request Mechanical HVAC product information

Request Electrical product information

   
 

Bachy Soletanche Limited prepares Canary Wharf site for new high-rise buildings

With London’s finance district, Canary Wharf proving to be a popular location for some of the largest international businesses, it is hardly surprising that the area is home to a number of ambitious building projects which will add to the London’s skyline. One such project is taking place at the Riverside South site, where Bachy Soletanche Limited (BSL) is constructing a considerable 610m diaphragm wall for two high-rise structures.

The site is one of the last river fronted areas remaining at Canary Wharf, located on the west side of the Isle of Dogs. The two buildings, proposed to be the second tallest in the Wharf, are specially designed to compliment the skyline without compromising the views of the famous three buildings – One Canada Square, HSBC Tower and Citigroup Centre – that have stood for several years.

The leading geotechnical firm is working in a joint venture with Costain under a contract with Canary Wharf Contractors Limited. The project includes the sophisticated diaphragm wall technique, as Ben Hardy, Bachy Soletanche Limited’s Contract Manager for the Riverside project, explained:
“We were awarded the ground works project to construct a basement wall around the perimeter of the site, having proposed the diaphragm wall technique in lieu of the conforming secant pile scheme. The superior watertightness of a diaphragm wall for the excavation of the three floor basement was a big selling point.”

A diaphragm wall is constructed in panels with the Riverside South project requiring a massive 96 panels to complete the 610m wall. However before the panels can even begin to be installed, a guide wall trench is being created to maintain the accuracy of the wall construction.

The ‘panels’ are a combination of 1000mm and 1200mm widths, and are constructed using 2.8m long rope grabs. They consist of three “bites” – a “virgin” bite, a “stop-end” bite and a “centre bite”. When these three bites are complete, each panel is up to 7m in length.

In order to form watertight joints between the panels, stopend casings containing a double sided water bar are placed at both ends of the first ‘panel’ prior to concreting. The stopend is designed so that half of the waterbar is cast into the panel and half is protected/contained within the structure of the stopend. These stopends are then withdrawn once the adjacent panels are excavated, and the second half of the waterbar is left behind to be encased in the concrete of the adjacent panels.

Ben Hardy continued:
“In normal circumstances we would just construct the diaphragm wall, but with the site being on a large bend in the River Thames, the Riverside site has a long history of boat building and boat maintenance. Dry docks have been built over the top of the other for centuries before finally being crudely backfilled in the middle of the twentieth century. A diaphragm wall grab is not designed to go through these timber, stone, concrete and steel structures, and therefore the project involves a significant amount of rotary coring.”

The old docks are cored out using 1500mm diameter coring equipment and rock augers down to a depth of 12m. The hard cored out material is then replaced with a soft slurry mix which the grab can easily ‘bite’ through after it has set.

Ben Hardy concluded:
“We have a systematic approach to this part of the project ensuring that the docks are fully cored out on the alignment of the panels. For the diaphragm wall operation to run smoothly we can’t afford to have a big lumps of material obstructing the grabs”

When the wall is complete in mid-spring 2008, the ground will be excavated by Costain with staged installation of ground anchors.

Email: fiona@manifestcomms.co.uk


HYDRO INTERNATIONAL Rainwater Harvesting News 210408

AUDLEY Retirement community living News 210408

T.I. Dynamic Facades Façade and cladding systems News 210408

The Sash Window Workshop Timber Windows and Doors News 210408

Leach Rhodes Walker Commercial architecture practices News 210408

Britannia Kitchen Ventilation Ventilated ceiling system News 210408

SAS International Architectural Steelwork News 210408

Armitage Shanks Washroom Equipment Services News 210408

ISG Jackson Construction Services Specialists New Builds News 210408

Emirates Glass LEAF Awards Architectual Design Awards News 210408

Miller Construction Construction Company Housebuilding Property Development News 210408

Housing Units Independent furnishing store News 220408

Kurawood PLC Organically modified softwood News 220408

Carillion Construction, planning and architecture News 220408

The Wood Awards Premier award for wood in buildings and furniture News 220408

Arup Designers, engineers and business consultants News 220408

Bachy Soletanche Geotechnical Specialists Structural Retaining Walls News 220408

Underwood Carpenter Project and Construction Management Company News 220408

Arup Planning and project management News 220408

Hamptons International International residential agents News 220408

Persimmon Homes Essex Planning,construction and architecture News 220408

L.B. Plastics Window systems company News 230408

Icopal Roofing and construction membranes News 230408

Britspace Modular construction industry News 230408

HKR Architects Architecture, planning and development News 230408

Knauf Drywall Plasterboards Plasters Drylining Wall Linings News 230408

Weatherite Building Services Air Movement Fans Supply Extract Units News 230408

Monodraught Natural Daylighting Sundomes Natural Ventilation News 230408

Kingspan Off-Site Timber Frame Systems Engineered Flooring News 230408

SPG Heat & Power (CHP) Technology News 230408

Jackson Building Centres Building Products News 230408

AICO Fire and smoke saftey products News 230408

Aico Ltd Smoke and heat alarm systems News 230408

Aico Ltd Fire and smoke saftey News 240408

Kent Fire & Rescue Service Safer with Sprinklers News 240408

Trevi Shower valves and kits News 240408

ISG Plc Construction Services Specialists New Builds News 240408

British Gypsum Plaster Plasterboard and Drylining Systems News 240408

Kawneer Systems Curtain Wall Systems Door systems News 240408

Imperial Bathrooms Free Standing Wash Stations News 240408

Gleeds International Management and Construction Consultancy News 240408

Advanced Ergonomic Technologies Ltd Underfloor air conditioning Access Flooring News 250408

Joint Contracts Tribunal Standard forms of contracts News 250408

Inbuilt Sustainable buildings, communities and construction News 250408

Toshiba Air Conditioning Systems Chilled Beams Splits News 250408

Bison Precast concrete products News 250408

Honeywell International Valves Pipework Systems Motorised Valves News 250408

Oventrop Heating and domestic hot water systems News 250408

Harlequin floors Dance floor specialists 250408

Gleeds Management and Construction Consultancy News 250408

Knauf Drywall Plasterboards Plasters Drylining Wall Linings News 250408

MITA Cable management systems News 280408

Senior Hargreaves Sheet metal products for building ventilation systems News 280408

British Woodworking Federation Joinery proffesional and woodworking industry News 280408

RMJM Architects International firm of architects News 280408

Stormsaver Rainwater harvesting systems News 280408

SSQ Slate products for construction industry News 280408

Corus Panels and Profiles Panels and Profiles News 280408

Tarkett Fully Flexible Sheet and Tiles News 280408

ISG Jackson Construction Services Specialists New Builds News 280408

Ward Insulated Panels Metal Roof Cladding Systems News 280408

Miller Construction Property development and construction News 280408

SPACIOTEMPO Modular temporary or permanent buildings News 280408

Spectrum Industrial Signs, cigarette litterbins and smoking shelters News 280408

Enact Energy National Home Energy Conference News 290408

Marshalls Hard landscaping transformation company News 300408

CMS Specialist Geotechnical Solutions News 300408

Clark Contracts Construction, planning and development News 300408

Isover Glass Mineral Wool Insulation News 300408

Lowry Homes Architecture, planning and construction News 300408

Marshalls Hard landscaping transformation company News 300408

Simmtronic Lighting Control Management Systems Dimming News 300408

DLG Architects Architecture, planning and development News 300408

Optex Europe Indoor Infrared Sensors CCTV Security News 300408

DGT Steel and Cladding Steel and Cladding News 300408

GROHE Tap and shower manufacturer News 300408

McKean & Company Construction company News 300408

Armstrong Valves Pipework Systems News 300408

English Partnerships National regeneration agency News 300408

WindowMaster Natural ventilation and smoke detection solutions News 300408

Silverdell (UK) Ltd Asbestos Removal Contractors News 010508

CONNAUGHT Construction planning and development News 010508

Kawneer Curtain Wall Systems Door systems News 010508

Kingspan Insulation Premium and high performance insulation products News 010508

Alpha Rail Fencing Railing Designs News 010508

Monodraught Car Park Ventilation Natural Daylighting Sundomes News 010508

Polyflor Sports Surfaces Safety Flooring News 010508

Westgate Joinery Timber and joinery products News 020508

Marshalls Street Furniture Hard landscaping transformation company News 020508

Eaton Williams Climate control solutions News 020508

The National Lottery Love UK campaign News 020508

Baxi-Senertec Combined heat and power News 020508

Kalzip Innovative aluminium roof and wall cladding system News 020508

Arundel Jones Associates LLP Registered in England and Wales No. OC330189
Hill Farm, Linton Hill, Maidstone, Kent ME 17 4AL
Tel : 01622 745333 email
copyright all rights reserved

News Categories : Geotechnical Specialists
Piling
Structural Retaining Walls
Ground Anchors Soil Nailers
Jet Groating Injection Grouting
Environmental Engineering
Building Design Engineers
Civil Engineering Projects