UNINTERRUPTIBLE POWER SUPPLIES LTD At Data Centre World 2011
UPSL will be exhibiting at
Stand B67 at Data Centre World Conference
& Expo, 2-3 March 2011. UPSL’s range of three phase UPS are
recognised for being at the forefront of power protection innovation
and technology and are class-leading in terms of system reliability
and efficiency – using less energy, generating less CO2, saving
valuable floor space, and achieving significant total cost of
ownership savings - making them ideal for IT applications & data
centres.
The three-phase UPS product range includes:
• PowerWAVE 9000DPA – rack-mounted, modular, transformerless UPS for
applications up to 250kVA
• PowerWAVE 8000DPA – rack-mounted or rack-independent UPS for
applications up to 120kVA
• PowerWAVE 6000 – stand-alone UPS for applications of 60-300kVA
• PowerWAVE 5000/TP – ultra-compact transformerless UPS designed
primarily for server rooms and data centres
These products will be available to view at the UPSL stand (B67) at
Data Centre World, London Olympia. UPSL’s team of experts will be
available throughout the exhibition to discuss your requirements and
Mike Elms, UK Sales Manager, will be presenting on Day 2 in the
Infrastructure & Facilities Theatre at 2.30pm. Mike’s presentation
will cover the topic of:
‘Using primary research to understand the motivating factors for
investment in IT equipment, whilst identifying the design elements
that guarantee reliability in a modern UPS system and how to ensure
users receive a true power protection strategy, not simply a piece
of hardware’.
3M Electro Cut
Graphic Films News 090211
3M Safety Spotlights Personal Protective Equipment News 110211
Andrews Water Heaters Wolverhampton Civic Centre News 090211
Armstrong Ceilings Metal Ceiling Tiles Barnet College News 090211
Armstrong CHP Boilerhouse Birmingham Womens Hospital News 070211
Bilco Roof Hatches Science Building Addenbrooks Hospital News 090211
CHR Equipment Kitchen The Freemasons Wiswell News 100211
Crown Paints Launch Pioneering Sustainability Initiative At Ecobuild
News 080211
Dimplex Advertising Standards Authority Ruling News 090211
Eaton Electric The Solar Hub Ecobuild 2011 News 090211
Flakt Woods Ventilation Fans Marmaray Tunnel Rail Project News
070211
Forticrete Launches New Centurion Literature News 110211
Glidden Trade Paint John Port School Etwall News 110211
Honeywell Relaunch UK Water Website News 070211
Ideal Standard Appoints Kerris Bright As Chief Marketing Officer
News 110211
Iko
Green Roof Riverbank- House London News 100211
Intatec Bathrooms The Dog And Doublet Hotel Staffordshire News
100211
Isothane The Salford Energy Hub Project News 100211
Kalzip Aluminium Standing Seam Sheets Newport Station News 100211
Laidlaw
Washroom Fittings Package News 110211
Leaderflush Shapland Launches Envision Facing Doorset Application
News 100211
Levolux Automatic Roller Blinds Liverpool Museum News 090211
Marley Eternit Clay Pain Tiles House Sutton Coldfield News 110211
Pilkington Colourful Glass Stairwell Derby University News 070211
Rudge Brothers Flooring Makeover Office Reality Wellington News
110211
Schott Solar Domestic Solar Energy Manor House Glinton News 110211
Schueco Solar Technology Photovoltaic Products News 080211
SIG Living Walls System Westfield Shopping Centre News 110211
Socomec Appoints News MD Andrew Wilkinson News 080211
Spirax Sarco Steam System Anglian Water News 100211
Trox
Active Chilled Beams Air Handling News 090211
Windhager Biomass Boilers For The Home News 100211
News Categories:
UPS systems Uninterruptible power supplies Three phase UPS
Arundel Jones Associates Ltd Hill Farm
Business Park, Linton Hill, Maidstone, Kent ME17 4AL
Tel : 01622 745333
news@buildingdesign.co.uk
See also:
| BuildingDesign Directory
|
BuildingDesign Tenders |
|BuildingDesign News Archives
| 2006 |
2007 |
2008 |
2009
|
BuildingDesign Recruitment |
AJA Part Time Jobs Board
|
© 2010 copyright all rights reserved
Registered in England and Wales No. 07334149
|