Fulton Limited has introduced a new TDS (total dissolved solids)
blowdown, energy recovery system, designed to increase boiler
efficiency and reduce demand on services/utilities, which in turn
reduces fuel, water and effluent bills.
The TDS Energy Recovery System recovers virtually all heat energy
from the blowdown and feeds it back into the steam system. This
process raises the temperature of the feed water directly to the
boiler and cold make-up to the hotwell tank.
The system can also boost the boiler feed water temperature up to
100°C, which helps to prolong the life of the boiler by reducing the
pressure drop and thermal shock on the pressure vessel experienced
when relatively cold water is added to the boiler. This in turn also
helps create a stable steam supply.
The TDS Energy Recovery System, which is operated using touch-screen
controls, displays real time energy and compliance cost savings. It
is designed and manufactured by Fulton in the UK and can be
specified for new boiler systems or retro-fitted to any existing
steam boiler installation.
|
E-mail Fulton Limited |
