- BuildingDesign News - Construction / Services News Archives
Wiring Devices - Cable Management - Power Distribution - Circuit Protection
Legrand has seen a wide selection of products from its
wiring device division specified and installed in five new
Advanced Learning Centres (ALCs) in and around Barnsley,
South Yorkshire.
Amongst the products selected for the project were Synergy
white, grid and metal clad switches and sockets, Tenby rapid
earth clamps, Hypra and Tempra sockets and plugs.
Legrand won the specification after a competitive tender
process, which saw the company highlight the quality and
breadth of its product range; the level of technical support
and expertise offered to contractors; and the steps it is
taking towards delivering a wholly sustainable operation in
the UK.
Caroline Boden, marketing manager for Legrand’s wiring
device division, said: “This kind of specification is an
ideal way to highlight the benefits of dealing with Legrand
as we have the product scope and quality to ensure we
deliver complete solutions for even the most complex of
projects.”
The Building Schools for the Future project has seen
Barnsley replace its entire secondary school estate with
nine new build ALCs, one new special school and the
substantial replacement of another.
Legrand’s products were specified for all five ALCs in Phase
1 of the development – The Dearne ALC, Kirk Balk Community
College, Darton College, Penistone Grammar ALC and Carlton
Community College – all of which were completed and handed
over during 2011. Additionally, Legrand secured the order
for Phase 2 of the project, covering Springwell Community
School, Greenacre School and Shafton ALC. To find out more
visit www.barnsleylep.co.uk.
For further information on Legrand please email below: