- BuildingDesign News - Construction / Services News Archives

Featured Video - Vertiv - 26th September 2017

SmartMod™ Hibernia Time Lapse Video

SmartMod™ Hibernia Time Lapse Video

One of the major challenges of the conventional data centre and telecom core site is making sure that the facility installed will fulfil its requirements a decade or more down the line. Predicting these requirements so far in the future is a difficult feat to undertake and is never an exact science. Rather than attempting to guess your future needs, a prefabricated, integrated modular solution, provides a structure that meets real and present requirements in the short and medium-term, while offering the capacity for future scalability. The process to manufacture and test the entire facility offsite in modules before shipping and then assembling those modules onsite ensure a best-in-class, tightly put together facility deployed faster and at a lower cost.

Additional Information Relating to Vertiv

Vertiv Logo
BuildingDesign Media © - Hill Farm Business Park, Linton Hill, Maidstone, Kent ME17 4AL, Tel: 01622 745333