- BuildingDesign News - Construction / Services News Archives

Featured Video - Vertiv - 26th September 2017

SmartMod™ Hibernia Time Lapse Video

SmartModô Hibernia Time Lapse Video

One of the major challenges of the conventional data centre and telecom core site is making sure that the facility installed will fulfil its requirements a decade or more down the line. Predicting these requirements so far in the future is a difficult feat to undertake and is never an exact science. Rather than attempting to guess your future needs, a prefabricated, integrated modular solution, provides a structure that meets real and present requirements in the short and medium-term, while offering the capacity for future scalability. The process to manufacture and test the entire facility offsite in modules before shipping and then assembling those modules onsite ensure a best-in-class, tightly put together facility deployed faster and at a lower cost.

Additional Information Relating to Vertiv

Vertiv Logo
BuildingDesign Media © - Hill Farm Business Park, Linton Hill, Maidstone, Kent ME17 4AL, Tel: 01622 745333