- BuildingDesign News - Construction / Services News Archives

Article Date: 13th March 2018

Vertiv - 4 Expert Keynotes over 2 Days - Data Centre World 2018 (Stand D720)

Data Centre World - Data Centres - Data Centre Optimisation

Vertiv - Data Centre World Logo

Data Centre World (DCW)
21st - 22nd March 2018, ExCel London
 

Here at Vertiv, we’re committed to bringing the industry the latest in infrastructure technologies and optimisation strategies to equip you in your quest for energy efficiency, security and availability and ultimately bottom line cost savings in your data centre.

We’ve gathered our subject matter experts to present at Data Centre World 2018, don’t miss their sessions:

Day 1: 21st March

10:45 - 11:10 It’s no longer cool to be cool – Data centre optimisation how you’re doing it wrong
Data Centre Design & Build and Physical Security Theatre
By Simon Brady, Head of Data Centre Optimisation EMEA

14:20 - 14:45 The Value of Energy Supply to the Grid: the Possible Drivers for Data Centres – Making Money or Client Constraints?
Facilities and Critical Equipment Theatre
By Russell Bulley, Technical Support Manager, EMEA

Day 2: 22nd March

10:45 - 11:10 How Workforce Shifts and Machine Knowledge are Changing the Data Centre
Energy efficiency, Cost Management and DCIM Theatre
By John Curran, Vice President of Product Marketing, Management Systems

12:15 - 12:40 Break-Through Cooling Technologies with the Utmost Energy Efficient Pumped Refrigerant Economiser for Tomorrow's Data Centre Applications
By Roberto Felisi, Product Marketing Director, Thermal Management EMEA

Book a meeting with our experts at DCW by using the email option below:

BuildingDesign Media © - BuildingDesign Portal | BuildingDesign Tenders